Trail of Instagram size for Blogger
This is just a trial to check out Instagram size posts on the blogger blog How they appear? Will that be ok or not?
link rel="shortcut icon" type="image/x-icon" href="/favicon.ico"
Skip to main content
Sr. no.
|
Description
|
Page no.
|
CHAPTER 1
|
||
1.0
|
Introduction
|
|
1.1
|
General
|
1
|
1.2
|
Aim
|
3
|
1.3
|
Objectives
|
3
|
1.4
|
Problem statement
|
4
|
1.4.1
|
Energy conservation and carbon dioxide emissions
|
6
|
1.4.2
|
Design life and flexibility
|
7
|
1.4.3
|
Cost analysis
|
7
|
1.4.4
|
Demolition & contamination
|
7
|
1.4.5
|
Recycling
|
7
|
1.4.6
|
Healthy building
|
7
|
1.4.7
|
CFCS, HCFCS and Halon’s
|
8
|
1.4.8
|
Noise & wind
|
8
|
1.4.9
|
Water conservation
|
8
|
1.4.10
|
Legionnaire’s disease
|
8
|
1.4.11
|
Timber
|
8
|
1.4.12
|
Lead and solvent based paints
|
9
|
1.4.13
|
Asbestos/formaldehyde
|
9
|
1.4.14
|
Thermal comfort & ventilation
|
9
|
1.4.15
|
Lighting
|
9
|
1.4.16
|
Landscaping
|
9
|
1.4.17
|
Contractor and supplier selection
|
9
|
1.5
|
What
is asset & portfolio management?
|
10
|
1.6
|
Historical
background
|
13
|
1.7
|
Potential
applications
|
14
|
1.8
|
Limitations of the study
|
14
|
1.9
|
Organization
of thesis
|
15
|
CHAPTER
2
|
||
2.0
|
Literature
review
|
|
2.1
|
Challenges before construction industry in India
|
16
|
2.2
|
Direct and indirect real estate in a mixed-asset
portfolio - is
direct or indirect preferable?
|
17
|
2.3
|
A modern portfolio theory approach to asset management
in the listed south African property market
|
18
|
2.4
|
Value
management in the construction industry:
What
does it entail and is it a worthwhile practice?
|
19
|
2.5
|
Active portfolio management and portfolio construction -
implementing an investment strategy
|
20
|
2.6
|
Practical risk analysis for portfolio managers and
traders
|
21
|
2.7
|
The
impact of residential property investment on portfolio performance
|
22
|
CHAPTER
3
|
||
3.0
|
Research methodology
|
|
3.1
|
Asset management
|
23
|
3.2
|
Different
valuation techniques
|
24
|
3.2.1
|
Life cycle costs
|
25
|
3.2.2
|
Income or investment method
|
26
|
3.2.3
|
Residual method
|
26
|
3.2.4
|
Contractors or cost method
|
26
|
3.2.5
|
The profits method
|
26
|
3.3
|
Methodology
|
27
|
CHAPTER
4
|
||
4.0
|
Case study carried out in locality
|
|
4.1
|
Collection of
project data Inora park
|
28
|
4.2
|
Collection
of project data Godrej Prana
|
29
|
4.3
|
Fortune
Siddhipriya a project by fortune group
|
31
|
4.4
|
Locality
of project silver stone Handewadi, Pune.
Project
by panama sun arch developers
|
32
|
CHAPTER 5
|
||
5.0
|
Planning & construction cost analysis carried out on ERP software
|
|
5.1
|
Budget summary of d-building with its
total activity cost & its percentage
|
36
|
5.2
|
Planning
& annual bar-chart for d building
|
43
|
5.3
|
Activity
estimated rate, amount & billing rate work out
|
53
|
5.4
|
Development
(amenity) cost
|
61
|
5.5
|
Landscape
details
|
71
|
5.6
|
Total
road calculations for the project
|
78
|
5.7
|
GI
pre-coated sheets parking shade
|
78
|
5.8
|
Paving
blocks work on project
|
79
|
5.9
|
Entrance
gate details
|
79
|
5.10
|
CCTV
installation work
|
84
|
5.11
|
Other
costs included in the project
|
85
|
5.12
|
Summary
for cost included in development & other
|
85
|
5.13
|
Cash
flow forecasting
|
87
|
5.14
|
Bar
charts of monthly construction cost
|
88
|
CHAPTER 6
|
||
6.0
|
Real
estate sales & marketing
|
|
6.1
|
Yearly
cash inflow details
|
90
|
6.2
|
Sales
cost summary
|
91
|
6.3
|
Monthly
cash inflow out flow
|
92
|
6.4
|
Total
project cash flow
|
93
|
CHAPTER
7
|
||
7.0
|
Discussions & conclusions
|
94
|
REFERENCES
|
95
|
Table no.
|
Description
|
Page no.
|
1
|
Collection of project data Inora park
|
28
|
2
|
Collection of project data Godrej Prana
|
29
|
3
|
Collection of project data fortune Siddhipriya a
project by fortune group
|
31
|
4
|
Details
of panama sun arch developers
|
33
|
5
|
Development (amenity) cost
|
61
|
6
|
UGWT RCC & Excavation details
|
62
|
7
|
UGWT Excavation work out
|
64
|
8
|
UGWT Concreting work out
|
65
|
9
|
Work in pump room near UGWT
|
65
|
10
|
Sewage treatment plant details
|
66
|
11
|
Swimming pool - excavation, RCC & backfilling
details
|
67
|
12
|
Swimming pool - water proofing details
|
68
|
13
|
Swimming pool - details of light, plumbing and
ladder & filtration equipments
|
69
|
14
|
Landscape details - labor charges
|
71
|
15
|
Tree plantation
|
72
|
16
|
Electrical work in landscape
|
72
|
17
|
BBM, plaster & paint details in landscape
|
73
|
18
|
Irrigation details
|
74
|
19
|
Play equipments
|
75
|
20
|
Golden river sand in play area
|
75
|
21
|
Gazebo in landscape
|
76
|
22
|
Tiles on Gazebo
|
77
|
23
|
Total road calculations for the project
|
78
|
24
|
GI pre-coated sheets parking shade
|
78
|
25
|
Paving blocks work on project
|
79
|
26
|
Entrance
gate details- RCC & excavation details
|
79
|
27
|
Pergola work details
|
81
|
28
|
Painting work
|
82
|
29
|
Toughened glass work
|
82
|
30
|
Electrical work
|
83
|
31
|
CCTV installation work
|
84
|
32
|
Other costs included in the project
|
85
|
33
|
Summary for cost included in development &
other
|
85
|
34
|
Yearly cash inflow details
|
90
|
35
|
Sales cost summary
|
91
|
Figure
No.
|
Description
|
Page
no.
|
1
|
Asset diagram
|
24
|
2
|
Valuation diagram
|
25
|
3
|
Budget
summary of d-building with its total activity cost & its percentage
|
36
|
4
|
Planning & annual bar-chart for d building
|
43
|
5
|
Activity estimated rate, amount & billing rate
work out
|
53
|
6
|
Cash flow forecasting
|
87
|
7
|
Bar charts of monthly construction cost for year
2016
|
88
|
8
|
Bar charts of monthly construction cost for year
2017
|
88
|
9
|
Bar charts of monthly construction cost for year
2018
|
89
|
10
|
Monthly cash inflow out flow
|
92
|
11
|
Total project cash flow
|
93
|
Comments
Post a Comment